
According to the investigation results, it is found that all towers are inclined towards river and the maximum inclination occurs the downstream tower of Chaungthar side. The downstream main cable sag is lower than the upstream one. Most hangers are inclined towards Pathein side and the maximum inclination degree occurs at middle portion. The existing truss profile is very different from as per drawing and all truss nodes are under the horizontal surface. Therefore seismic risk assessment and disaster mitigation plan for unexpected future severe earthquake should be developed.
By Win Bo | Khin Maung Zaw | Kyaw Kyaw "Investigation on the Existing Geometry of Pathein Suspension Bridge"
Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-6 , October 2018,
URL: http://www.ijtsrd.com/papers/ijtsrd18436.pdf
Direct Link: http://www.ijtsrd.com/engineering/civil-engineering/18436/investigation-on-the-existing-geometry-of-pathein-suspension-bridge/win-bo
international peer reviewed journal, paper publication for engineering, conference issue publication
No comments:
Post a Comment