
It was noted that the average productivity rate of the selected assembly line was only seventy-one (71) percent way down below from their target output. Based on the findings of the study, plant layout was one of the contributing factors that causes bottleneck in the assembly line particularly in the pairing and aligning of cut goods.
Task time involved in each process was studied and computed based on optimal number of manpower and expected productivity rate. In effect, combining the processes of pairing and aligning of cut goods in one line contributes great impact in reduction of machine requirements per process to improve the productivity rate of the company.
By Amaya, Flocerfida L | Delos Santos, Rafael, A | Tenorio, Rodolfo Jr. V"Productivity Improvement in a Sewing Line Through Line Balancing in a Garment Manufacturing Company in the Philippines"
Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-4 , June 2018,
URL: http://www.ijtsrd.com/papers/ijtsrd15666.pdf
Direct URL: http://www.ijtsrd.com/engineering/industrial-engineering/15666/productivity-improvement-in-a-sewing-line-through-line-balancing-in-a-garment-manufacturing-company-in-the-philippines/amaya-flocerfida-l
international journals in engineering, paper publication for engineering, conference issue publication
No comments:
Post a Comment